Brainerd Road Construction update

4/27/2021 one lane is closed on Washington St.(Highway 210) bridge over Mississippi river in Brainerd Minnesota. Crews are performing an inspection of the bridge.
Construction on NW 4th St/Riverside Dr meaning it will be closed to thru traffic from highway 210(Washington St) to Beaver Dam Road.

photos: 
Washington street bridge inspection person on yellow boom truck